Menlo Drive Pedestrian Improvements

Beaverton, OR

The City of Beaverton identified sidewalk improvements throughout the City as one of their 10 priorities for the investment of public funding.

About this Project

This project provides ADA compliant sidewalks along SW Menlo Drive allowing for a safer, accessible route for the community. In addition to sidewalks, new curbs, grading, drainage, paving, signing, striping, and ADA crossings were installed. The project also includes new water quality facilities where space is available while upgrading the stormwater system.

3J provided alternative analysis, preliminary design and construction documents for this project. 3J staff participated in public and internal City meetings to get neighborhood input and to assist the City in selecting the preferred alternative. 3J also provided inspection services including erosion control inspection.

  • Client

    City of Beaverton

  • Completion Date

    Summer 2019

  • Services

    • Civil Engineering
    • Construction Inspection
    • Project Management
    • Water Resources Engineering

New sidewalks, curbs, grading, drainage, paving, signing, striping, and roadside development are installed on SW Menlo Drive.

ADA compliant sidewalks allow for a safer, accessible route for the community.

Upgrades to the stormwater system provide better conveyance and treatment of stormwater.

The sidewalk design was modified to accommodate a 120-year-old white oak tree.