3J provided civil engineering and water resources engineering to design the site layout for the project, specifically the 98-lot parking lot, and provide storm water solutions to account for the hillside stadium.
3J was contracted through the architect, IBI Group, to assist with the expansion of the stadium and associated parking lot. The development also included a new stadium pavilion. We provided civil engineering and water resources engineering to design the site layout for the project. The site included a nearly 100-lot parking lot, as well as storm water solutions for the hillside stadium. 3J also provided the district with long term development options and strategies to maximize the use of the district property.
IBI Group
Fall 2022